Sizing Uninterruptible Power Supplies for Energy Efficiency
Rising electricity costs and the prospect of energy rationing mean it’s never been more important for uninterruptible power supplies to be correctly sized. Increasingly, power protection customers are being urged to be energy efficient and play their part in tackling climate change. If an uninterruptible power supply is significantly over-sized it will run inefficiently. ‘Undersizing’ will introduce the risk of system overloads.
This is particularly true for a power-hungry end-user such as a datacenter. The latest high-end servers require more power to operate – and greater cooling resources. According to some reports, every megawatt needed to power datacenter hardware draws another 1.5 MW to cool it!
Is UPS Sizing just simple math?
According to business continuity experts, the proportion of business continuity plans invoked by power failures has jumped recently. Why? Either energy supply is less reliable or existing uninterruptible power supply installations are unsatisfactory – or non-existent!
Historically, power protection has been oversized so that, at full capacity, the system itself isn’t overloaded. Oversizing also leads to higher installation and ongoing maintenance costs. Undersizing, however, especially in a busy datacenter where equipment is being continuously added and switched in and out, will soon cause problems.
Whilst an on-line uninterruptible power supply has a built-in automatic bypass for emergencies, running close to design limits with regular overloads is bad practice. Some oversizing is always best.
The secret of power protection sizing
Firstly, the equipment being protected (the ‘load’) must be categorized into critical, essential and non-essential loads.
Critical Loads are the IT and electrical components that make up the business architecture and without which business continuity would be lost: servers, computers, storage devices, telecommunications, security and building management systems. Their power protection will probably require some extended runtime to keep equipment running continuously; probably also redundancy so that if a power outage occurs, and one UPS is unserviceable, another can take over.
Essential Loads are vital to the business (datacenter, machine room or some such) but in their absence some functionality can exist. Some essential loads may need redundancy to be built into power protection, but in many instances back up needn’t be as robust as for critical loads.
Non-essential loads are those that the business can survive without until power is reinstated: printers and canteen facilities for example.
The Power Factor in UPS sizing
An understanding of the importance of ‘real power’ is crucial for power protection sizing. Kilowatts (kW) are a measure of the real power drawn by the load whereas kilovolt-amps (kVA) are a measure of apparent power. The difference between the two is the power factor (pf) and its size can present problems when specifying uninterruptible power supplies.
The greatest efficiency comes from operating at a power factor of 1.0 or ‘unity’. Though computer equipment has been approaching this in recent years, many UPS systems have not kept pace. The solution is to specify an uninterruptible power supply with as high an output power factor as possible – with a power factor of 0.9 set to become the standard. UPS manufacturers like Riello UPS have set the bar at this level with new energy efficient products being released onto the market.
As well as being correctly sized, power protection systems should consist of units offering an input power factor of not less than 99%. This should enable users to cut energy wastage by up to 40%. Harmonics generation and heat output should also be low and today’s UPS should offer a small footprint so as (in the case of a datacenter) not to take up too much valuable revenue earning space.
Scalability
Finally, and looking to the future, power protection should be ‘scalable’. This means additional uninterruptible power supply modules can be added without having to rip out and replace the unit each time power protection requirement increase.
As always, time invested in assessing and categorizing loads, determining their size and power requirements and calculating a correctly sized power protection system will pay dividends. Naturally, UPS sizing consultancy is available from manufacturers such as Riello.
The way to enjoy peace of mind and cost savings from a correctly-sized power protection system, is to think about slightly oversizing UPS, categorizing loads, calculating power factor and being mindful of scalability.
About the Author
Alison Campbell-Boreham is the editor of The Power Protection Guide and provides PR services to Riello UPS Ltd, the UK subsidiary of Riello UPS (RPS S.p.A). For more information visit the Riello UPS - uninterruptible power supplies website.
Non Powered
![]() |
![]() HO Scale Brass Models MTS CTA 4000 Series Baldies power non power pair US $212.55
|
![]() E Suydam Co Model 5001 Pacific Electric Double End PCC Non Powered US $200.00
|
![]() Bachmann HO 81945 AMTRAK ACELA LOCO DCC ON BOARD20012018PoweredNon Powered US $159.99
|
![]() AHM Santa Fe Powered Non Powered EMD FP 45 HO Scale Model Train Engines 1456 US $89.99
|
![]() Keystone HO 105 Steam Shay 20 Ton Class A Non Powered US $64.99
|
![]() Athearn HO 4105 EMD SDP 40 Powered Non Flywheel Freight Locomotive SANTA FE US $59.99
|
![]() ATHEARN HO M A NEW YORK CENTRAL PA 1 DUMMY LOCOMOTIVE 4211 NON POWERED KIT US $52.00
|
![]() ATHEARN HO M A NEW YORK CENTRAL PB 1 DUMMY LOCOMOTIVE 4303 B UNIT NON POWERED US $50.00
|
![]() Marklin HO District Inspector Car Era III NON POWERED US $48.00
|
![]() ATHEARN HO DUMMY NON POWERED NEW OLD RUN GN U33C HO UNASSEMBLED NEW OLD STOCK US $32.50
|
![]() HO TRAIN E 7 A LOCOMOTIVE AMTRAK E 7 NON POWER DUMMY US $27.99
|
![]() Marx HO Scale New Haven Dummy Non Powered B Unit Diesel Engine US $26.99 |
![]() Union Pacific F3 A B Ph 2 Early High Fans Non Powered US $25.00
|
![]() Athearn HO F7 A B Powered Engine with Dummy Non Powered B unit US $31.99
|
![]() Tyco Diesel F9 Non Powered Union Pacific A X Unit MIB US $24.99
|
![]() HO LIFE LIKE SANTA FE EMD GP 38 AB POWERED NON POWERED DIESEL ENGINES VGC US $21.99
|
![]() Athearn HO F7 A Dummy Non powered Engine Amtrak 103 US $15.99
|
![]() Athearn 4724 HO Scale GP40 2 CSX Non powered Dummy Locomotive NIB US $11.09
|
![]() HO SCALE ATHEARN DUMMY NON POWERED TRAINMASTER PRR ROAD NUMBER 6703 US $15.99
|
![]() HO SCALE ATHEARN DUMMY NON POWERED SD9 BURLINGTON NORTHERNROAD NUMBER 6147 US $15.99
|
![]() HO SCALE ATHEARN DUMMY NON POWERED SD9 SANTA FE ROAD NUMBER 2963 US $15.99
|
![]() HO SCALE ATHEARN DUMMY NON POWERED SD9 SOUTHERN PACIFIC ROAD NUMBER 5339 US $15.99
|
![]() HO Scale Classic Street Car NON POWERED US $9.99
|
![]() HO Gauge Budd Car Pair 10 InLength RDC 2 Chesapeake Ohio Powered Non US $7.99
|
![]() RAIL POWER 121 HO SCALE GP 35 NON DYNAMIC BRAKE US $5.00
|
![]() Bachmann HO Scale Santa Fe Diesel Engine NON POWERED US $4.99
|

Is it ok to use 30 weight non detergent oil on a 2 cycle gas powered scooter?
I have a 2 cycle engine gas powered scooter, and my grandfather says to use 30 weight non-detergent oil in place of 2 stroke oil. Is that safe?
no. only use 2-stroke oil. sorry gramps is wrong.


US $212.55