Coal Loader
Operation Manager or Engineering
CURRICULUM VITAE
Hereby under one’s hand
N a m e : Farid Suharsono
Address : SARANA WISMA PERMAI
Jl. Wisma Permai I No.129 Surabaya 60115
Telp. 6231-5964099
Date of Birth : 15 April 1966
Marital Status : Married
Health : Excellent
Job Experiences
PT. Kaltim Persada - PT. Bukit Baiduri Energi. From : 2005 – 2007
Position as Coal Mining Project Manager
Between PT. Bukit Baiduri Energi as the “KP HOLDER” a company duly established under the laws of the Republic of Indonesia with its office at GRAHA GANESHA Jalan. Hayam Wuruk No.28, 3rd floor, Jakarta Pusat 10120, of the first party, and PT Kaltim Persada as the “CONTRACTOR”) a company duly established under the laws of the Republic of Indonesia with is office at Jalan Pahlawan No.1 Samarinda Kalimantan Timur of the second party.
At This Project I have full responsible to manage all operational, commenced from :
- Manage all operational mining costing and Scheduled mining Open Pit.
This sections I blocking out of budget all operational cost from the : Area Original, Drilling Sediment Crossed Section, Stratigraphi Seam of Coal, Boundary Area Pit, Planning Production Schedule Removal Over Burden, Coal Cleaning, Coal Extraction and Coal Hauling, Coal Finishing and Processing.
a. Pre-Production Stripping Stage.
b. Regular Mining Stage.
c, Final Cutting Stage.
- Manage Heavy Equipments and Coal Productions
This section I’m directed with Maintenance Manager to discussed maintenance engineering basical of service 250,500,750,1000,2000 hour and make to planning schedule Mid Life Engine and Over Haul all component Heavy Equipment so as to Coal Productions be able appropriate for Plan Productions Schedule.
- Manage Safety and Environment
During occupying as Project Manager at mining area PT. Bukit Baiduri Energi Kalimanatan Timur I awarded to KP Holder Safety 1,000,000 hrs anti induction from Loss Time Fatal Accident and free impact strength environment.
- Project Reported
I have responsible to make report appear to be site to Director as Weekly Report, Monthly Report, Recovery Charge, Stock On Hand, ETC
PT. THIESS INDONESIA – ARUTMIN INDONESIA : 2003 – 2005
Position as Heavy Equipment Planner (Coal Mining)
During joint with PT. THIESS Indonesia I have full responsible to handle operational all Heavy Equipment Schedule from Greasing, Servicing, Change Component Schedule and Mid Life Engine, General Over Haul, Calibaration Payload Measurement High Dump, Trouble shooting Electronic Technician at Senakin Project Kotabaru Kalimantan Timur.
I have handle Heavy Equipment as, High Dump CAT 777, Komatsu 785, Volvo A35D, Hauling Truck Volvo F16, Bulldozer D11 CAT, D10 CAT, D9 CAT, 375 Komatsu, 275 Komatsu, D85ESS Komatsu, Excavator Liebherr 994, Liebherr 992, Komatsu PC1250, Komatsu PC1100, Komatsu PC800, Komatsu PC650, Komatsu PC300, Wheel Loader 992 CAT, 988 CAT, 966 CAT, 450 Komatsu, ETC.
HANDAYANI COMPANY SURABAYA : 2000 – 2003
Position as Operation Manager (Hydrate Lime Manufacture)
At this company is not much difference as explicable above but difference too with processing coal mining, right here chalk stone take time for burning became to lime stone and processing again with crusher plan to air separator sizing perfectibility as required.
Handayani Company in collaboration with Government Company PT. Petro Chemical Industri for Water Treatment and Other Product.
PT. JOHN HOLLAND – ARUTMIN INDONESIA : 1991 – 2000
Position as Project Administrator & Engineering (Coal Mining)
At PT. John Holland Company I’m much self study for all database management as of :
1. Mining
Mining Surface, Mining Design, Survey Original Mining Area, Stratigraphi, Drilling Crossed Sections, Operational Mining Application, Calculate BEP Equipment and Circle Time Productions. ETC
2. Ware House
Inventory, Purchase Request, Purchase Order, Material Out Standing, Stock On hand, Dead Stock, Slow Moving, Fast Moving including Physical Check. ETC
3. Maintenace
Manage all Operational Equipment so as to Mining can be working properly that is my responsible to control as I do ménage : Greasing, Servicing, Component Schedule Check, Preparation Spare Part dispatch, Mid Life Engine or Component, General Overhaul, Fuel Consumption. ETC
4. Financial Accounting
For Financial Accounting I have just to know : Forecast and Labor Cost, Consumables .
After I have got much experiences at this Project because no someone can be to operate computerize at that time and all management have still used manual system system after that I’m going to be a change for the better with Computer system John Holland Company happy feast eyes on change result.
I’m to try calculate all operational project became report cost per hour and of Loss/Profit company and someone to assist perfecting my experiences his my Senior Colin F Marten from Melbourne Australia.
DELTA SURYA HOSPITAL : 1990 – 1991
Position as Computer Supervisor (Hospital)
I’m working at this Hospital not a long time because dissonant with my aspiration.
Last Education :
Akademi Manajemen Informatika & Komputer (A.M.I.K.A)
Surabaya 21 November 2007
Regards,
Farid Suharsono
About the Author
Coal Loader
![]() |
![]() A0224 LIONEL 97 RARE REMOTE CONTROL COAL LOADER WITH ORIGINAL BOX US $375.00
|
![]() Lionel 397 Yellow Generator Coal Loader w 70 Lamp US $207.00
|
![]() Lionel Post War 397 Coal Loader Operating Accessory Missing Belt Tested Works US $125.99
|
![]() LIONEL POSTWAR 397 OPERATING COAL LOADER SET W OB US $125.00
|
![]() 6 14157 397 Coal Loader 4D US $120.00
|
![]() Lionel 397 Remote Control Coal Loader in The Original Box VTG Antique US $119.99
|
![]() LIONEL POSTWAR 397 OPERATING COAL LOADER US $87.00
|
![]() LIONEL POSTWAR 397 COAL LOADER NEEDS BELT GOOD SHAPE US $79.99
|
![]() LIONEL POSTWAR 397 COAL LOADER US $79.99
|
![]() Vintage Lionel 397 Operating Coal Loader Postwar US $80.99
|
![]() LIONEL PREWAR OPERATING COAL LOADER 397 W BOX 0 027 ga US $65.00
|
![]() Lionel 497 100 Coal Loader Controller US $59.95
|
![]() Lionel 97 54 Coal Loader Scoop US $59.95
|
![]() 97C 1 97 164 Coal Loader Controller Assembly NOS US $49.95
|
![]() for Lionel 97 Coal Loader Repair Parts US $39.99
|
![]() Lionel 97 2 Coal Loader Base Nice US $34.95
|
![]() VINTAGE LIONEL O GAUGE OPERATING COAL LOADER 397 w BOX OPS $1325 CEILING PRICE US $31.01
|
![]() Lionel 397 Rubber Belt Coal Loader US $30.00
|
![]() LIONEL TRAINS 397M 1 MOTOR ASSEMBLY FOR 397 COAL LOADER NICE WITH WARRANTY US $29.00
|
![]() Lionel 397 COAL LOADER 364C LIONEL CONTROL SWITCH US $24.49
|
![]() for Lionel 97 Coal 164 Lumber Loader Controler US $18.50
|
![]() Lionel 97 controller Coal or Log loader US $17.95
|
![]() LIONEL TRAINS 397 6 COAL LOADER BELT HIGH QUALITY REPLACEMENT WITH INSTRUCTIONS US $16.50
|
![]() Lionel 397 Coal Loader For Parts Restoration US $14.99
|
![]() 397 6 Coal Loader Belt US $14.95
|
![]() 397 6 COAL LOADER REPLACEMENT BELT US $13.99
|


US $375.00
























